From initial enquiry to handover. Planning, design, construction, installation, commissioning.

So realisieren wir Ihr Projekt Schritt für Schritt

From the first enquiry to handover, we work with clearly defined milestones. Each phase builds logically on the previous one. Decisions are made early and implementation remains predictable. This results in a transparent process with clear responsibilities, realistic timelines, and an outcome that is handed over ready for operation.

  1. Step 1

    Enquiry and Objective Definition

    We define objectives, location, area, target group, budget framework, and timeline. The result is a clear project brief as the basis for concept and planning.

    • Area, location, target group
    • Budget framework and time window
    • Desired systems and requirements
  2. Step 2

    Site Assessment and Feasibility

    We review dimensions, access points, ceiling height, technical infrastructure, and safety-related conditions. The goal is a feasible foundation without surprises.

    Dimensions Access points Power supply Network Safety
  3. Step 3

    Concept and Layout

    We develop zones, user flow, capacity, and safety clearances. The result is a robust layout that covers both operation and experience.

    • Zone planning and circulation
    • Safety areas and clearances
    • Capacity and operating concept
  4. Step 4

    Design and 3D Visualisation

    Look, materials, theme, and details are visualised in 3D. This is the decision point: approval or adjustment.

    Gate

    After the 3D visualisation, you decide whether we proceed.

  5. Step 5

    Proposal and Schedule

    After approval, we prepare a written proposal including scope of services, options, milestones, and responsibilities.

    Scope

    Delivery Scope and Options

    Plan

    Milestones and Dates

    Interfaces

    Responsibilities Defined

  6. Step 6

    Implementation and Coordination

    We coordinate drywall construction, production, delivery, and installation. The goal is a clean installation plan without conflicts between trades.

    Drywall construction Production Logistics Installation
  7. Step 7

    Installation, Testing, Acceptance, Handover

    On-site installation, functional testing, acceptance, and briefing. You receive documentation and a handover report.

    • Testing and safety check
    • Acceptance and documentation
    • Briefing and handover report

Diese Leistungen realisieren wir im Projekt

Depending on the project scope, we handle individual trades or the complete implementation from a single source. The following areas are fixed components of our project process and work seamlessly together. With one click, you can access the respective detail pages.